S.# CLIENT WORKS DESCRIPTION YEAR OF AWARD
1 Shell Aviation Calibration testing and checking of overfill protection system installed at EJHD Karachi Airport & Quetta Airport 2015
2 Pakistan State Oil Limited Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 14 Different Location. 2015
3 Pakistan State Oil Limited Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 14 Different Location. 2014
4 Heavy Mechanical Complex Re-Calibration and Re-Commissioning of Instrumentation system at boiler 2014
5 Pakistan Petroleum Limited Dismentling of Instruments from Chachar Gas field and Installation, testing & commissioning at Gambat South Gas Field 2014
6 Hascol Petrolium Supply,Installation,Testing and Commissioning of Level Transmitter,Alram Annunicator Panel complete in all respect at Shikarpur Terminal. 2014
7 OMV Pakistan installation, testing and commissioning of all instruments at Sawan North Horizontal - 1 Wellhead & Pipeline including conduiting,cable laying,Earthing,fabrication & installation of solar panels. 2013
8 Descon Engineering Installation, testing and commissioning of 06 number radar level gauging system at Parco Refinery Asphalt Air-blowing unit. 2013
9 OMV Pakistan Field instrument calibration and installation,Fire & Gas system at Latif Gas Field Development Project. 2013
10 Pakistan Petroleum Limited Installation, commissioning startup of HRL Gas compresion facility. 2013
11 SIPCHEM Preparation of proof test procedures and test sheets for the calibration of instruments installed at the SIPCHEM plants. 2013
12 United Energy Pakistan Dismantling,installation,testing & commissioning of E&I works of Turk facility at Naimat West. 2013
13 SHELL AVIATION Supply & laying of cable for Emergency Shutdown system at EJHD 2013
14 Pakistan State Oil Limited Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 14 Different Location. 2012
15 Chevron Pakistan Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 04 Different Location. 2012
16 United Energy Pakistan installation ,testing and commissioning of all instruments at Shekhano - 1 Remote Compression. 2012
17 BYCO Refinery Supply, Installation testing, cabling, conduting and commissioning of 06 number Radar Level Gauging System 2011
18 Pakistan State Oil Limited Lalpir Terminal Rehabilition works,Supply & Installation of Cable Tray,JB's & Glands of RTG system. 2011
19 OMV Pakistan installation , testing and commissioning of Miano-12 Wellhead Phase - II. 2011
20 SHELL AVIATION Supply & Installation of Motorized valves at EJHD karachi airport. 2011
21 Shell Pakistan Limited Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 03 Different Location. 2010
22 Pakistan State Oil Limited Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 14 Different Location. 2010
23 Chevron Pakistan Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 04 Different Location. 2010
24 Universal Terminal LTD Supply, Installation testing & commissioning of 03 number Radar Level Gauging System Keamari Terminal. 2010
25 BYCO Refinery Supply, Installation testing &commissioning of 36 number Radar Level Gauging System. 2010
26 OMV Pakistan installation, testing & commissioning of E &I works at Sawan-15 Wellhead . 2010
27 National Refinery Limited Supply, Installation testing & commissioning of 55 number Radar Level Gauging System Phase-II. 2010
28 Shell Pakistan Limited Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 03 Different Location. 2009
29 Chevron Pakistan Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 04 Different Location. 2009
30 OMV Pakistan Supply, Installation testing &commissioning of 36 number Radar Level Gauging System. 2009
31 Shell Pakistan Limited Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 03 Different Location. 2009
32 Chevron Pakistan Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 04 Different Location. 2009
33 OMV Pakistan installation, testing & commissioning of all E & I works at Latif 2 Flowline & Wellhead Development Project. 2009
34 Petronas Carigali Saqib 1A EWT Wellhead Development Project 2009
35 OMV Pakistan installation , testing & commissioning of Sawan 10 Wellhead Compression Project. 2009
36 OMV Pakistan installation , testing & commissioning of Miano 13 Wellhead Development Project. 2009
37 OMV Pakistan installation, testing & commissioning of E & I works at Miano 12 Flowline & Wellhead Development Project. 2009
38 OMV Pakistan installation , testing & commissioning of Sawan 14 Wellhead Development Project. 2009
39 OMV Pakistan installation , testing & commissioning of E & I works at Tajjal -1 EWT Wellhead & Flowline Development Project . 2009
40 OMV Pakistan installation , testing & commissioning of Miano 8 & 10 Wellhead Gas Compression Project. 2009
41 OMV Pakistan installation , testing & commissioning of all instruments at Latif 1 & 2 Project. 2009
42 OMV Pakistan Maintenance Contract of Radar Tank Gauging System with Supply of Spare Parts and Services at 04 Different Location. 2009
43 Total Lube Oil Blending Plant Installation of DBs, Air-Conditioner, Power Cables, Cable trays, Lighting fixtures, Power outlets, Cable conduits and other cable accessories. 2008
44 BHP billiton Installation, testing and commissioning of 03 number radar level gauging system at Zamzama Gas field. 2008
45 Descon Engineering Installation and commissioning of 02 number Radar Level Gauging System at Bubak Pumping Station 2008
46 Total Parco Supply,Installation,Testing and Commissioning of Radar Type Level Transmitter,Level Switches,MOV's,Cable,Cable Tray & SES Designed Panel at Machike Terminal. 2008
47 Shell Aviation Supply, Installation & Testing of Leak detection system at Islamabad, Nawabshah and Sukkur. 2008
48 OMV Pakistan Installation, testing , calibration, Pre-Commissioning & Commissioning of Electrical & Instrument works. at Sawan-13, Well Development Project. 2008
49 National Refinery Limited Supply, Installation , testing & commissioning of 55 number Radar Level Gauging System Phase-II. 2008
50 OMV Pakistan installation , testing & commissioning of Sawan-10, Sawan-6, Minao-11 and Sawan-11 Wellhead Development Project. 2008
51 Chevron Pakistan Supply , Installation,Testing & Commissioning of 10 Nos RTG's at Keamari Terminal Karachi. 2008
52 Chevron Pakistan Supply of Cables,G-I conduit,Explsion Proof (Junction Boxes & Glands) 02 Nos RTG's and its complete Installation,Testing & Commissioning at Shikarpur Terminal complete in all respect. 2008
53 Chevron Pakistan Supply of Cables,G-I conduit,Explsion Proof (Junction Boxes & Glands) 03 Nos RTG's and its complete Installation,Testing & Commissioning at Machike Terminal. 2008
54 Chevron Pakistan Supply of Cables,G-I conduit,Explsion Proof (Junction Boxes & Glands) 06 Nos RTG's and its complete Installation,Testing & Commissioning at Morgah Terminal Rawalpindi. 2007
55 National Refinery Limited Supply, Installation, testing & commissioning of 41 number Radar Level Gauging System Phase-I. 2007
56 Petronas Carigali installation , testing & commissioning of all instruments at Rehmat-3 Wellhead Development Project. 2006
57 Pakistan State Oil Limited Supply,Installation,testing & commissioning of 17 number Radar Level Gauging System at 14 different location all over PakistanPhase-III complete in all respect. 2006
58 MOL installation , testing & commissioning of all instruments at Makori-1 Well EPF Project -Phase-II & III. 2006
59 Pak-Arab Refinery Limited Supply, Installation, testing & commissioning of 10 number Radar Level Gauging System at Korangi. 2005
60 Pak-Arab Refinery Limited Supply, Installation, testing & commissioning of 02 number Radar Level Gauging System at Keamari. 2005
61 Chevron Pakistan Supply.installation & commissioning of PLC based Fire/ESD system. 2005
62 Pakistan State Oil Limited installation , testing & commissioning of all instruments at Makori-1 Well EPF Project -Phase-II & III. 2005
63 Pakistan State Oil Limited Supply, Installation, testing & commissioning of 41 number Radar Level Gauging System at 14 different location all over Pakistan Phase-I. 2004
64 Shell Pakistan Limited Installation testing, cabling, conduting and commissioning of 10 number radar level gauging system at Machike Depot. 2003
65 Shell Pakistan Limited Installation testing, cabling, conduting and commissioning of 11 number radar level gauging system at Chaklala Depot. 2003
66 British Petroleum Installation, testing and commissioning of all instruments at BP at Mazari Oil Field. 2002
67 Shell Pakistan Limited Installation testing, cabling, conduting and commissioning of 13 number radar level gauging system at Keamari Depot. 2002